Parks & Rec

CUB CREEK PARK

206 S. Bridge St., Wilkesboro, NC 28697
PARK MAP

  
PARK AMENITIES:

1-Sign
2-butterfly garden - 500 px
2-butterfly in bf garden2-500 px
20160830_121544
20160830_121703
20160830_121828
20160830_122306
20160830_122455
bee in community garden 2-500 px
dove-at-park-500px
IMG_1741-001
IMG_1742-001
IMG_1746-001
IMG_1773-001
IMG_1799-1738-001
IMG_2743-02
IMG_2750-1a
IMG_2765
IMG_4215-001
IMG_4219-001
IMG_4221-00001
IMG_4222-0001
IMG_4223-001
IMG_4224
IMG_4225
IMG_4227-001
IMG_4231-001
IMG_4234-001
IMG_4235-001
IMG_4236-001
IMG_4237-001
IMG_4238-001
IMG_4244-001
IMG_5276
IMG_5278
IMG_5493
IMG_5494
IMG_5496
IMG_5497
IMG_5500
IMG_5501
IMG_5504

 

      • NEW!! Butterfly Garden

      • Picnic Shelter with tables
        - on a first come, first serve basis  -
        - no reservations taken 

      •  3 of 4 Bike Trails are completed.
        - Tracks are being GPS plotted for signs & maps - coming in Fall 2017. 

Facebook Find Us @ CubCreekParkNC

 

PARK RULES

  • Reservations are not required for picnic shelter, tables or grills - are on a first come, first serve basis.
  • Don't be a Litter Bug - please place trash in designated trash receptacles.
  • Please make sure fire is out in grill prior to leaving area.
  • No bikes, skateboards, or roller blades in designated area - Watch for signs.
  • Leash Law enforced. 
  • Please pickup all animal waste.
    CubCreekPark 120x48 Cedar  

 FUTURE PROJECTS FOR THIS PARK

  • Construct new concession stand and restrooms to replace old structure. 
  • Construct a 4th bike trail.
  • Post signs for the completed Bike Trails.

 

  

CUB CREEK COMMUNITY GARDEN

CUB CREEK 2-2

kiosk

Our community garden is maintained through the active participation of the gardeners themselves. Fresh gardens allow our citizens to grow their own food which provides fresh produce and plants into their everyday lives for healthier living. Other benefits are the satisfying labor, self reliance, connection to the environment, the opportunity for multi-generation and cross-cultural connections, neighborhood improvement, and a sense of community.

The gardener leases a garden plot each season which may or may not be the same from year to year.  Handicap raised beds have been added this year as well. Cub Creek Community Garden’s goal is to be a place that invites neighbors, friends, and families to communicate and relate through a shared experience. Through the aid of the Master Gardeners, Cub Creek Community Garden offers tips and advice on how to make your own garden plot better, whether you are a beginner or expert.

Besides the gardening activities, other advantages include a series of special work days, email updates on garden conditions, and having Master Gardener’s to provide a helping hand. Where else could you get a deal like this!

For Application:

If you would like to have an opportunity to participate in this experience, please complete a garden application. Please pick up the completed application and pay fees to the Wilkes County Extension Office  before April 15th. We look forward to seeing you this year!

IMG 0380b

 

What is a Master Gardener and Would You Like to Become a Master Gardener?  To find out how click here.  

 

The new raised beds have been completed in Winter 2017.

community garden raised beds  

 

CUB CREEK RESTORATION & RAIN GARDENS

restoration-award-with-cub-creek-restoration-headerThe Town of Wilkesboro embarked on a project to rehabilitate and save Cub Creek which runs through Wilkesboro, mainly Cub Creek Park. It starts on the west side of Bridge Street along an unnamed tributary to College Street near the Wilkes County Department of Social Services (DSS) through Cub Creek Park on South Bridge Street to Oakwoods Road and finally empties out into the Yadkin River further downstream.

The restorations were performed in several phases and the work was done between 2007 through 2012. The town rehabilitated 8,300 feet of Cub Creek inside the park. The town received grants to cover about $750,000 of the one million project cost. The town paid its share through in-kind manpower and equipment and only $10,000 in cash was spent for supplies.

IMG 5460a-Frame-500X400px

 AWARD WINNING

A statewide drinking water protection group recently announced eight inaugural winners of an awards program that recognizes individuals, organizations and others that protect sources of public drinking water. The N.C. Source Water Collaborative presented the awards at the March 18 Water Resources Research Institute’s annual conference. Any individual, group, organization, or agency that engages in activities to protect drinking water at its source may be eligible for an award. The awards program is intended to support local drinking water protection, while identifying successful projects that can be duplicated statewide. Awards were presented to the Town and BREC for this restoration project.Additional information is available on the website at: http://ncswc.org, or by contacting Rebecca Sadosky at 919-707-9096, or email Rebecca.Sadosky@ncdenr.gov.

PHASE ONE

Phase One Location – South side of Bridge Street in the Cub Creek Park downstream to the eastern end of the old walking track, about half way point to Oakwoods Road.

Tasks for Phase One

- Creek banks widened for flood plains

- Silt removed to create pools
- Planted the banks with vegetation and trees and to be left in the natural state to establish the banks and for natural surroundings
- Large rocks placed in creek for slowing the running of water and created an old fashioned swimming hole and wading access for kids near the picnic shelter and playground 
- Extended the ball fields with moving portions of the walking trails and installed new lighting 
- Created our Kids Fishing days and increased number of visitors to the park 
- Installed trout kiosks. 

Goal for Phase One

- Make creek habitable for trout while eliminating the erosion on creek banks so the NC Wildlife Resources Commission could begin stocking this part of the creek with trout.

BEFORE PHOTOS Cub Creek before images

PHASES TWO & THREE

Phase Two Location – West Side of Bridge Street from Wilkes County DSS to the bridge on S. Bridge Street, meeting up with phase one.

Phase Three  Location – East End of Cub Creek Park, where phase one stopped, to Oakwoods Road.

Tasks for Phases Two & Three:

- Removing larger bends, which was the main cause of flooding, and straighten out the creek
- Add floodplains within the creek banks
- Silt removed to create pools
- Large rocks placed in creek for slowing the running of water
- Create additional storage for flood waters to minimize any future flooding in the park
- Make more habitable trout waters
- Remove damaged trees that were in bad shape or in an area that wouldn’t allow the trees to live much longer. The soil around many of the trees closest to the creek had been washed away in heavy rains that left many hanging precariously over the creek 
- Plant new trees when digging was done to provide shade in a couple of years and creates a rippling effect to allow more oxygen to get into the water through the plants and trees
- Phase two - extended the walking trail from College Street (near Wilkes County DSS) for walkers and residents of Rose Glen Retirement Village and Historic Wilkesboro School Apartment Complex to make ease of access for senior citizens in this area
- Replace Phase three creek channel to its original location from over 100 years ago and back to the old creek location
- Most of the cobble extracted during Phase three was used for the creek bed and walking trails, which reduced the cost as compared to phase one
- Phase three - extended the walking trail to Oakwoods Road

This project allowed the citizens of Wilkesboro to have a high quality creek that can provide trout habitat while reducing the risk of flooding and erosion.  The project was made possible by Engineer Derek Goddard and his firms, Blue Ridge Environmental Consultants (BREC) and Blue Ridge Geomatics. Goddard approached the project with several steps that can be found in the attached PowerPoint slide show and photos of before and after shots.  

AFTER PHOTOS
 after-images

 RAIN GARDENS PLANNED AT CUB CREEK

rain garden3In spring of 2014, two bio-retention projects or rain gardens were planned at Cub Creek and these are shallow, man-made depressions with plants and other vegetation. The purpose of these 1/3 acre gardens is to collect storm water runoff from the asphalt parking lots and other impervious surfaces.

The benefits of the Rain Gardens:

- The plant roots need nitrogen and phosphorus, two major contaminants of the runoff water, in order to survive and these elements will be removed before the water gets into the creek
- Collecting of the water in the gardens allows the water to cool as well as treat and clear some of the sediment before flowing into the creek, which makes for cleaner water and improves chances for year-round trout habitats

There have been several concerns that the gardens will be breeding grounds for mosquitos and Derek Goddard of BREC assured the town this would not be the case. The plantings are what dictate the presence of mosquitos and plantings will not include mosquitos attracting plantings such as cat tails.

In awarding the grant for the new Rain Gardens, former Governor Bev Perdue recognized the town for its effort to rehabilitate Cub Creek. She said, “Your efforts to improve water management infrastructure in the community are to be commended.”

FUTURE RESTORATIONS PLANNED

The town is planning yet another phase to restore Cub Creek downstream in the future. In December 2016, the town council voted to apply for grants to restore 1,800 linear feet of Cub Creek adjacent to the town’s wastewater treatment plant between Old 421 and the Yadkin River. 

 

CUB CREEK MAP

Print Maps

 

Westside of Cub Creek ParkEastside of Cub Creek Park

   

  

  

  

  

  

  

 

 

 

 

 

 

IMG 1786dogParkHIDDEN OAKS DOG PARK 

 

The Town of Wilkesboro and the Humane Society of Wilkes partnered to bring this dog park to fruition. The Humane Society of Wilkes also has a buidling beside the dog park and it is open from 12 - 3 PM on most Mondays, Wednesdays, and Fridays.

The Hidden Oaks Dog Park is located on an acre tract within municipal owned Cub Creek Park and is fenced in for your pooch's delight to run and play off leash.  The fenced-in area is broken into two areas ~ one for large breeds and the other for smaller breeds. 

During 2016, a large covered area for pet owners to sit, relax, stay cool/dry while their furry friends run and play. This covered area sits in the center of the small and large dog areas and sitting is provided.

Other amenities and rules:hydrant

  • Dogs should not be left unattended.
  • Children under 12 should be accompanied by an adult.
  • A watering station for pets and of course, a fire hydrant is provided within the dog park.
  • Owners are welcome to bring toys and balls for their furry friends to play with.
  • We asked that all dogs to be well socialized and have all vaccines before entering the park, which is on an honor system.
  • Once a dog shows any aggression towards other dogs or humans, they should immediately leave the two Parks.
  • Female dogs in heat are not permitted until after their cycle ends.
  • The town is not responsible for any accidents/injuries or other incidents between dogs and owners.
  • Owners should clean up after their animals. Doggie waste bags and dispensers are located throughout the park.
  • Animals must be on a leash in other areas of the park outside of the dog park fencing, example: walking and mountain biking trails, creek, & fields.
  • The nearby Cub Creek has been underwent a restoration and now kids and pets can get down to the water to cool off.

Petiquette rules, see park sign.   

alt